Kukui Plaza, 2 1/2 acre roof garden,  with koi ponds, Olympic pool,
 , extensive mature plantings and entertainment facility, Honolulu, HI

 


LANDSCAPE
                ARCHITECTURE

                                                             Throughout California and the Pacific Rim,
                                                with  Barron Eldridge

 

Barron Eldridge MLA
 

 (916) 487-5351
 
barronsdesign@
         surewest.net
          ---

Table of Contents

1
Senior Landscape Architect

2
The Profession


3
Getting Started
 

4
Contact Information


5
Professional History

6
Prof. Hist. ...continued


 
  Hit Counter

 
 

 

 

 

 

 

Professional History, continued:

Project:  Kukui Plaza: Honolulu, Hawaii

Kukui Plaza (Block G): 2.5 acre roof garden on three levels, constructed over
a four story parking structure.

Office:    Donald Wolbrink and Associates
(The principles of this firm have retired and their locations unknown)

Team Landscape Architect: Block G, or
Kukui Plaza,
occupies an entire city block on the mauka side of Honolulu.

Title and Responsibilities:   
Conceptual Planner: Developed extensive gardens, circulation, Koi ponds, Olympic pool, special use areas and supporting systems.
Problems and Solutions: Tree weights at maturity, a light weight soil mix, recycled drainage and politics.

                  The Lagoon, the upper level
    gardens behind. After some
    ten years, the trees and shrubs are now full grown.

Other Projects: While associated with this firm:
Del Webb's Kahuku Resort
( now the Turtle Bay Hilton ):  Project area included the grounds around the condominiums, hotel, golf course, the beach and water front along Turtle Bay.
Assignment: The condominiums were build and some occupied. The roads and parking in place and previous consultants from out of state were gone.
Problem: Parking areas were full of tree and shrub containers, and there were no irrigation and planting plans.
Process: Barry flagged locations for irrigation heads. The installation crews trenched and installed the irrigation equipment behind him. After the irrigation was installed and tested, he sited all the tree and shrub containers for the planting crews. 

              Master Plan: Kona Coast, Island of Hawaii Long term development plan centered around the community of Kailua, including: Kings Beach, waterfront, the Church plaza, commercial properties and up-country lands.
The Study: Clarified options for residents and commercial interests, while mitigating conflict between cars, pedestrians and pressures for development.

              Poli Overlook, Honolulu, Hawaii: Site plan and design elements for site at the top of the Nuuanu Valley, which overlooks the windward side of the island.
The Challenge: This is a  historical site: where King Kamehameha won a decisive battle for the Island of Oahu.

National Cemetery of the Pacific (Punchbowl), Honolulu, Hawaii: Ten year master plan design to resolve current problems while planning for the future.
Problem: Originally built in the late 1940s, this monument to those lost in World War Two had many problems. This site was approaching capacity, experiencing significant conflicts between tourists, cemetery users and vehicles.
Product: Barry provided the text, photos and supporting diagrams for the Master Plan Report. As the project was approaching its conclusion, the Army Signal Corps had him write and direct a film describing the master plan process. The Master Plan and supporting film were presented to the Veterans Administration in Washington D.C.
 

 

                                            Back to the Top
 

 

Project: North Shore Development Study, Maui, Hawaii
             35 square miles of the North Shore on the  Island of Maui, Hawaii

Office:   Alexander and Baldwin (A & B), Honolulu, Hawaii 
             Bob Sasaki Principle (808) 525-8494
 

Title and Responsibilities:

§   Long Range Planner-Landscape Architect: Contract Administrator: Alexander and Baldwin owns C % H Sugar, Matson Lines and over 100,000 acres of cane land across the State of Hawaii. Sugar subsidies were changing do to competition from 3rd world countries and development pressures were intense. 
Barry provided land planning services while managing outside consultants on A & B projects throughout the Islands of Oahu, Maui and Kauai.

Other Projects while associated with this firm:

§   North Coast of Maui: Developed 50-year Development Plan for lands between the Maui airport and Maliko Gulch, some 35 square miles including: the community of Paia and uplands to Makawao.
Study: Composed of graphics & supporting text for circulation, commercial, residential, recreation and agriculture. The Paia Sugar Mill was confirmed redundant and closed as a result of this work.

 

 


Project:   Pauluea Bay, Mekena: Island of Maui, Hawaii:  75-acre destination resort along
              the shore of Paulauea Bay, Maui, HI

Office:    Norman Lacayo & Associates, Honolulu, HI:  
              Norman Lacayo is retired and living in Mexico.

Title and Responsibilities:

 o  Site Planner: A multi-use destination resort complex.
High-rise Condominium Towers: On the south-westerly peninsula.
Residential Condominiums: These upland units stepped down the hillside.
Corporate Villas: Sited around two lakes, connected by ribbon waterfalls.
Lakeside village/Spa: Clustered across from the Paulauea Bay beach.
Circulation: Cars parking was in underground units. Surface transportation needs would be with golf carts.

 o  Landscape Planting Concept:  Slopes designed like "Burmese" rice terraces designed for abundant water movement and filled with tropical plant materials.

Other Projects with this firm:
o   Ko Olena, Eva New Town, Oahu,
    Hawaii
    
Project: High-rise condominium
    surrounding by lakes, with a
    grotto spa sited between the
    towers. Project was sited on the
    Eva peninsula, right on the ocean.
   
Features:  Included a swim-
    ming bay, open to the Pacific, a
    quarry designed fresh water pool,
    water features and an upper lake
    with cabanas.


o  
Fashion Island, Newport Beach, CA:          Pacific Towers, Honolulu: High rise
     
Assignment: The Newport, CA office        commercial and residential complex.
     of WAT&G (Wimberly Allison Tong &       
A Podium development project, including:
     Goo) was understaffed and needed         
Street level and high rise gardens and
     help resolving site plan conflicts. 
               water features.                                                                             

 

                                               Back to the Top
 

 

Project:     Master Plan for Hewlett Packard Company, Santa Rosa, CA:

Office:       Barron Eldridge MLA, Landscape Architect

Responsibilities:  A Design-
  build project on 100 acre
  campus including: dance
  pavilion with connecting
  terraces stepping up through
  a grove of Live Oaks.
  Facilities were designed for
  HP employees and their guests.

Additional Studies Requested:
 
 Site Planning and Conceptual
   Documents for Conference
   Center in a Craftsman Period 
   style, including recreation lake,   Dance Pavilion with adjoining terraces and
   ball fields and a solar supported   Recreation Facilities
   field house.                                       


                                           

  Other Project Work:
  o   Four Seasons Hotel:
      
Island of Maui, HI
      
Contract Administrator,
      
Field Designer for the
       water features
    
  o   Grand Wailea: Island
      of Maui, HI  
     
Field Designer for the
      water features

  o   Korbel Winery:
      New bottling & shipping
                                                                                facilities.

    Hyatt Regency Resort Hotel:
  The Lobby Falls,
    Island of Kauai, HI


 Sebastiani Winery: 
     Bottling & shipping facilities.

o   Vaca Pena Intermediate School:
     Campus development, Vacaville,
     California

o   State Farm Insurance Co.
    
Regional Headquarters: Honolulu,
     Hawaii

o   Oceanic Cablevision.
    
Regional Headquarters: Honolulu,
     Hawaii

o   Beaver Creek Resort:
     Site planning team member:
     Beaver Creek Ski Area, Beaver
     Creek, CO

o   Cannery Cove:                                              Hale O Malia, Conceptual Diagram prepared
     Housing development. East shore of
        for discussion purposes.  Retirement, life
     Grizzly Bay, including: tide land           
 care complex with water features, including
     restoration, Antioch, CA                    
   2 1/2 acre roof garden with tennis courts.

o   Ukiah High School:
     New campus development, Ukiah, CA
 
                                                                             
 
o   Bank of America:                            
 
     Upgrading individual bank locations   
  
     throughout the Island of Oahu, HI                         
                                                         END

                                                Back to the Top